Case Study
The Edge of Doom Distribution
(The content of this paper is the opinion of Evin Stump, Sr. Systems Engineer at Galorath Incorporated) Many distributions have been proposed for use in Monte Carlo simulation of project cost or duration risks. To that fascinating and not always coherent collection, I hereby add one that I believe has obvious merit. I call it the “edge of doom” distribution.