| 1979 |
|
|
Galorath Associates Founded (Becomes Galorath Incorporated) |
|
|
| 1988 |
|
|
First Release of SEER-SEM |
|
|
| 1991 |
|
|
Detailed Staffing Profiles Introduced |
|
Dynamic Activity Allocation Introduced |
|
Maintenance Model Introduced |
|
|
| 1993 |
|
|
Function Based Sizing Introduced, Radically Simplifying Functional Sizing |
|
|
| 1994 |
|
|
Maintenance Model Updated To Include Rigor and Level of Effort |
|
Multi-Program Estimating In A Single WBS Element Introduced |
|
Detailed Labor Rate Accounting Introduced |
|
ACE-IT Export Introduced |
|
Defect Model Introduced |
|
Parametric CMMI Level Estimating Introduced |
|
|
| 1996 |
|
|
Staff Loading and Staffing Constraints Introduced |
|
Monte Carlo Risk Assessment Introduced |
|
|
| 1997 |
|
|
SEER-Y2K Model Introduced to Specially Model the “Year 2000 Problem” |
|
|
| 1998 |
|
|
Industry’s First COTS Integration Model Introduced |
|
|
| 1999 |
|
|
SEER API Introduced |
|
Object-Based Sizing Introduced |
|
Time-Phased Defects Modeling Introduced |
|
|
| 2001 |
|
|
Innovative Functional Metrics Research Receives Widespread Attention |
|
Industry’s First (and Still) Most Powerful MS Project Integration |
|
Introduction of Historical Database, Tying Together Numerous SEER Features |
|
|
| 2003 |
|
|
Industry’s First Data Mining Model (Independent Crosscheck) |
|
Detailed Risk Analysis Introduced |
|
Innovative Research in Use Case Metrics |
|
|
| 2004 |
|
|
Introduction of Estimate by Comparison |
|
|
| 2005 |
|
|
Project Monitoring and Control Feature Introduced |
|
Integration with Rational Rose (later RSA) |
|
SEER-SEM Core Math Published in Crosstalk Magazine |
|
Metrics Analysis & Benchmarking Feature Introduced |
|
|
| 2006 |
|
|
Galorath Incorporated Joins SEI Performance Benchmarking Consortium |
|
“Software Sizing, Estimation, and Risk Management” Book is Published |
|
Extreme Schedule Capability Added to SEER Model |
|
Estimate by Comparison Accuracy Benchmarks Are Published |
|
|
| 2007 |
|
|
Galorath Incorporated achieves ISO 9000 certification |
|
|
| 2008 |
|
|
SEER for IT Projects Introduced |
|
Introduction of Enterprise Shared Database |
|
International Benchmark (ISBSG) Repository Integrated with SEER |
|
|
| 2009 |
|
|
Introduction of Browser-Based Client |
|
|
| 2010 |
|
|
Small Schedule Capability Added to SEER Model |
|
Numerous New, Data Driven Features Introduced |
|
Collaboration Introduced |
|
Requirements-Based Cost Tool (CostIQ) Introduced |