CECIM: A Capability Improvement Model For Cost Engineering

August 26, 2008 · Filed Under Estimating, Estimation Process, General, Project Management  - 0 Comment(s)

Being a major fan of repeatable process for cost and cost engineering, I cant help but admire the work of CECIM (Capability Improvement Model for Cost Engineering.) CECIM was an excellent piece of work in establishing estimation maturity and repeatable process.  The major document is a white paper written by H. Pickerin and D. Lewis.  Carl Dalton of Galorath International teaches CECIM along with Hugh Pickerin in the UK.

I look forward to the expansion and usage of this process in a larger way.

CECIM includes 19 Cost Engineering Process Areas…

  1. Cost Estimating
  2. Cost Modeling
  3. Cost Control & Analysis
  4. Value Engineering & Cost Reduction
  5. Planning
  6. Risk Management
  7. Competences Management
  8. Define the Process
  9. Improve the Process
  10. Integrate Disciplines
  11. Ensure Quality
  12. Design to Cost & Cost as an Independent Variable
  13. Supply Chain Management
  14. Knowledge Management
  15. Capital Asset & Resource Management
  16. Business Case Analysis
  17. Audit
  18. Cost Allocation

CECIM includes a 6 level scale of maturity

0 Not Performed
1. Performed Informally
2. Process Planned and Tracked
3. Process Well Defined
4. Quantitatively Controlled
5. Continously Improving

CECIM intends that organizations identify and prioritize process improvements for estimation.



Thank you for reading “Dan on Estimating”, if you would like more information about Galorath’s estimation models, please visit our contact page or call us at +1 310 414-3222.

Related posts:

  1. GAO Cost Assessment Guidebook The GAO cost assessment Guidebook is something you should keep an eye on if you work in the government environment...
  2. The Estimate Maturity Model Can Improve Project Success Dan Galorath briefed the Galorath estimate maturity model, a method of evaluating where the organization is in estimation practice and...
  3. Cost Readiness Level (CRL) Establishing Cost Risk Based On Engineering Decisions I am working on a paper for NASA’s project manager conference.  In the course of this work I again reviewed...
  4. Heuristics for Systems Engineering Cost Estimation Dr. Ricardo Valerdi of MIT sent me a pre-publication copy of his upcoming IEEE article. Here is the abstract: “Engineering...
  5. Estimating Systems Engineering…. The Upcoming Book.. and SEER I had the opportunity to review Dr. Ricardo Valerdi’s (MIT) upcoming book on the COSYSMO model for estimating systems engineering:...